Valuable items • Custom packing • Bulk projects • Charlotte, NC

Pack Charlotte guide

What to prepare before a kitting project

A useful kitting brief explains what goes in each package, how many versions exist and when the components will be ready. This checklist helps a Charlotte business prepare a defined employee, event or promotional-kit project.

Plan the components in a spreadsheet

A blank spreadsheet with fields for components, quantities, versions, readiness and assembly instructions. Open it in Excel or Google Sheets. Keep recipient addresses in a separate file.

Download the component checklist (CSV)

Start with the finished kit count

Confirm how many complete kits are needed and whether they will all be identical. If employee and executive kits have different contents, give each version a clear name and its own count. A single total without version rules leaves too much to decide during assembly.

  • Name each version
  • Count the kits in that version
  • Identify personalized inserts or other differences

List the components in one kit

Record every product, card, leaflet and supplied packaging component. Add the quantity needed in one kit and the number of kits using it. Total units needed equals quantity per kit multiplied by kits in that version.

For example, a planned run of 100 identical kits containing one notebook and two cards needs 100 notebooks and 200 cards. This is a planning example, not a completed customer project. Any extra units or contingency quantity should be agreed for the actual job.

Check what is available and when

Compare required quantities with the items you have. A product arriving later than the printed inserts can change when assembly is practical. Record the component-ready dates and tell the packing team about missing items before agreeing a production window.

  • Distinguish items on hand from items still being ordered
  • Identify supplied boxes or presentation materials
  • Flag shortages before delivery to the packing location

Approve the physical arrangement

An approved sample makes the instructions easier to repeat. Confirm the contents, order of inserts, item placement and packaging before the whole batch is assembled. Presentation materials and protection for shipping serve different purposes, so discuss both if the kits will travel.

When a project has several versions, the assembly rules must make those differences clear. A component change after approval may require another review of the package and the quote.

Choose the handoff before labeling

Kits collected together need a different release plan from individual shipments to many recipients. Tell us whether finished kits are for pickup, one delivery location or separate addresses. Recipient data and shipping-label requirements can be agreed after the initial project review.

  • State the desired packing completion date
  • State any recipient arrival requirement separately
  • Keep the version rules consistent with the recipient list
  • Confirm the data format before sending the final list

Send a short project summary first

To start a quote, send the kit count, component list, known variations, component-ready date and intended handoff. Approximate sizes and values help the team understand the packing work. If a detail is unknown, say so rather than guessing.

Pack Charlotte focuses on scheduled projects with a defined beginning and end. Long-term inventory storage and daily ecommerce fulfillment call for a different service model.

Ready to discuss the project?

Tell us what needs packing, the quantity and your deadline. Unknown details can be clarified after the initial review.

Request a packing quote
Need something packed?Get a quote